Use este identificador para citar ou linkar para este item:
http://bdex.eb.mil.br/jspui/handle/123456789/3640
Registro completo de metadados
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.advisor | Debastiani, Gilson | - |
dc.contributor.author | Castro, Henrique Fernandes | - |
dc.date.accessioned | 2019-05-14T12:50:30Z | - |
dc.date.available | 2019-05-14T12:50:30Z | - |
dc.date.issued | 2018 | - |
dc.identifier.uri | http://bdex.eb.mil.br/jspui/handle/123456789/3640 | - |
dc.description | Dissertação (mestrado em Ciência Militares) apresentada à Escola de Aperfeiçoamento de Oficiais (ESAO) como parte dos requisitos para o grau de Mestre. | pt_BR |
dc.description.abstract | O presente estudo procura propor a autoprodução de energia elétrica no 15º Batalhão Logístico (15º B Log), como opção para a racionalização dos gastos com eletricidade, sem comprometimento da segurança e capacidade operacional militar, através da implantação da geração distribuída fotovoltaica (GD FV). Desta forma, buscou-se dimensionar e verificar a viabilidade técnica e econômica (EVTE) da instalação de uma usina GD FV no 15º B Log, que suprisse 100% do consumo fora de ponta da OM, levando em consideração o impacto percentual que essa instalação causaria nos gastos com energia elétrica. Foram avaliados os padrões de consumo e demanda de energia elétrica da Unidade, através do levantamento histórico tarifário elétrico do período compreendido entre janeiro de 2013 e dezembro de 2017, com intuito de quantificar o consumo da Organização Militar (OM), em ponta e fora de ponta e assim avaliar a necessidade do potencial de geração elétrica, para tornar tecnicamente viável a implantação da usina GD FV. Foi, ainda, analisado o valor monetário das contas do ano de 2017, com objetivo de mensurar o gasto médio mensal necessário ao custeio de energia elétrica da OM e, assim, calcular a economia a ser gerada pelo sistema GD FV. Os dados necessários ao correto dimensionamento desta usina, os quais são as coordenadas geográficas da OM, as áreas de telhado disponíveis para instalação dos painéis fotovoltaicos e os índices de radiação solar na cidade de Cascavel – PR foram coletados através de pesquisa de campo. O material colhido foi introduzido, juntamente com o potencial de geração elétrica necessária a usina, no simulador PVsyst® 6, software especializado no dimensionamento de plantas fotovoltaicas. O relatório gerado pelo simulador foi enviado para empresas especializadas que geraram orçamentos para implementação do projeto. De posse do valor do investimento necessário para instalação da usina e da economia a ser gerada, foi possível afiançar a viabilidade econômica do projeto, por meio da aferição do tempo de retorno do investimento, que foi de 06 (seis) anos, frente a um ciclo de vida de 25 anos da usina GD FV._____________________________________________________________________________________ABSTRACT The present study seeks to propose the self-generation of electric power in the 15th Logistic Battalion (15º B Log), as an option for the rationalization of electricity expenditures, without compromising safety and military operational capacity, through the implementation of distributed PV generation . In this way, we attempted to size and verify the technical and economic viability (EVTE) of the installation of a GD FV plant in the 15º B Log, which surpassed 100% of OM's out-of-state consumption, taking into account the percentage impact that this installation would cause us to spend on electricity. The Unit's electricity consumption and demand patterns were evaluated through the electric tariff history survey of the period between January 2013 and December 2017, in order to quantify the consumption of the Military Organization (OM), both in and out of and thus to assess the need for the potential of electric generation, to make the implantation of the GD FV plant technically feasible. It was also analyzed the monetary value of the accounts for the year 2017, with the objective of measuring the average monthly expenditure necessary to the costing of electric power of OM and, thus, calculate the savings to be generated by the GD FV system. The data necessary for the correct sizing of this plant, which are the geographical coordinates of the OM, the roof areas available for installation of the photovoltaic panels and the solar radiation indices in the city of Cascavel - PR were collected through field research. The material harvested was introduced, together with the potential of electric generation needed by the plant, in the simulator PVsyst® 6, software specialized in the design of photovoltaic plants. The report generated by the simulator was sent to specialized companies that generated budgets for project implementation. Given the value of the investment needed to install the plant and the economy to be generated, it was possible to secure the economic viability of the project, by measuring the time of return of the investment, which was 6 (six) years, against a 25-year life cycle of the GD FV plant. | pt_BR |
dc.language.iso | pt_BR | pt_BR |
dc.subject | Energia elétrica | pt_BR |
dc.subject | Geração distribuída fotovoltaica | pt_BR |
dc.subject | Usina solar | pt_BR |
dc.subject | Viabilidade técnica e econômica | pt_BR |
dc.title | Geração distribuída fotovoltaica no 15º B LOG : proposta para racionalização dos gastos com energia elétrica na vida vegetativa da OM | pt_BR |
dc.type | Dissertação | pt_BR |
dc.rights.license | É permitida a reprodução do conteúdo da obra desde que seja, obrigatoriamente, citada a fonte. É proibida a reprodução para fins comerciais, bem como qualquer alteração no conteúdo da obra. Autorizada a disponibilização na BDEx pelo autor. | pt_BR |
Aparece nas coleções: | DECEX : DESMIL: ESAO: PUBLICAÇÕES ACADÊMICAS |
Arquivos associados a este item:
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
DISS_CASTRO_ESAO.pdf | 4,84 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.